I. Project Background

This return logistics operation involved high-end skincare products, specifically caviar face masks and eye creams. The goods were produced in Germany with materials sourced from France, originally destined for Shanghai, with the final recipient being a client in the Yiwu Free Trade Zone. Due to the inclusion of specific ingredients, the shipment required strict adherence to regulations concerning endangered species during international transport and customs clearance. A valid CITES permit was a core document for clearance, making compliance and timeliness critical for the entire logistics process.

Cargo Information:

  • 1 Package / 110 kg / 0.67 CBM

Product Names:

  • Caviar 24-Hour Face Cream

  • Caviar Eye Cream

Transport Route: HAJ–GYD–PVG–HKG


II. Initial Logistics Process

Departure from Germany: As agreed with the client, our team in Germany completed the cargo inspection and reinforced the packaging before entrusting a local agent with the export transportation. The shipment departed from Hanover, Germany (HAJ), and, after a stop at a transit airport, arrived smoothly at Shanghai Pudong International Airport (PVG). We tracked the cargo's status in real-time, providing the client with updates on its location and estimated arrival time through our logistics information system. The shipment arrived in Shanghai on schedule without any damage or delays.


III. Inspection and Customs Clearance Obstacles at Shanghai Port

Inspection Trigger: Upon arrival at Shanghai Pudong International Airport, the cargo was moved to the customs supervision area to await clearance. During a routine inspection, the shipment was flagged for detailed examination. Customs officials meticulously reviewed the cargo’s qualification documents and consignee information, which marked a critical turning point in the logistics process.

Clearance Issue Identified: The customs inspection revealed a critical discrepancy in the provided CITES permit. The consignee registered on the permit was a Hong Kong-based company, whereas the customs declaration form clearly stated the actual recipient was a client located in the Yiwu Free Trade Zone, with the goods intended for storage in a bonded warehouse there. According to customs regulations, the consignee information on the CITES permit must exactly match the customs declaration and the actual recipient. This mismatch led to an immediate halt in the clearance process, and the goods could not be released.


IV. Multi-Party Communication and Coordination Attempts

Collaboration with the Customs Broker: Upon identifying the issue, we immediately initiated emergency discussions with our partner customs broker. Leveraging their extensive experience, the broker analyzed the core problem and explained the customs requirements in detail. They made several attempts to communicate with customs officials on-site, trying to explain the context of the information discrepancy and submitting supplementary documents to prove the legitimacy of the cargo's ownership and intended use. However, customs insisted on the principle of document consistency, and these initial efforts failed to achieve a breakthrough.

In-Depth Negotiations with Customs: To further resolve the issue, we, along with the customs broker, scheduled a meeting with the head of the relevant customs supervision department. We provided a detailed explanation of the practical need for the return shipment, the background of our client relationship, and the reason why the CITES permit was registered to a Hong Kong company. We also promised to provide additional supporting documents promptly. Nevertheless, customs officials stated that clearance into a free trade zone involves a special supervision model and that the inconsistency between the consignee and the CITES permit holder violated core regulatory articles. Without resolving this mismatch, they could not approve the release of the goods. Multiple rounds of communication failed to secure a consensus for release.


V. Solution Development and Execution

With clearance in Shanghai stalled and multiple rounds of negotiations proving fruitless, the project team swiftly activated its emergency decision-making mechanism. By breaking down the core conflict and assessing available resources, the team devised a solution centered on an "inter-regional entity switch." Leveraging the geographical advantages and client relationship of our Hong Kong branch, we decided to have them take over the entire subsequent process. The execution steps were as follows:


A. Shifting Coordination to the Hong Kong Branch: From "Crisis Response" to "Solution Restructuring"

Problem Review and Decision Rationale:

The central issue in Shanghai was that the CITES permit for the returned goods was registered to a Hong Kong company, not the domestic shipper. The Shanghai customs authority required the entity managing the return to be the same as the one on the CITES permit—a requirement our mainland team could not meet. After our Hong Kong branch confirmed that the Hong Kong client possessed the necessary qualifications for direct customs clearance and was familiar with local regulations on endangered species trade, the decision was made to activate a cross-regional coordination mechanism, with the Hong Kong branch leading the subsequent process.

Comprehensive Information Synchronization and Requirement Definition:

The project team immediately established a "Shanghai-Hong Kong Special Project Group" and completed three key actions:

  1. Seamless Document Transfer: All relevant documents—including the written feedback from Shanghai customs, the original export declaration, scanned copies of the CITES permit (with endorsement pages), the packing list (noting the percentage of endangered species ingredients in each SKU), and the air waybill—were categorized and shared. Key points of contention, such as the specific regulations violated by the discrepancy, were highlighted.

  2. Clear Definition of Responsibilities: The Hong Kong branch's core duties were clearly defined: manage the ownership transfer对接, pre-audit and declare clearance documents in Hong Kong, and handle local cargo reception and transport.

  3. Timeline Agreement: A timeline was set, requiring a preliminary review within 3 working days and full process implementation within 7 working days.


B. Hong Kong Branch Audit: From "Data Verification" to "Risk Prevention"

Upon receiving the request, the Hong Kong branch formed a dedicated task force comprising a compliance specialist, a logistics operator, and a client liaison. They initiated a three-tier audit to ensure full compliance:

Tier 1: Entity Association and Document Integrity

The compliance specialist first verified the legal connection between the CITES permit and the Hong Kong client by checking the company name and registration number against the Hong Kong Intellectual Property Department's enterprise registration system. This confirmed the client's legal trade qualifications under Hong Kong's Protection of Endangered Species of Animals and Plants Ordinance. They also reviewed the document checklist, identified a missing "Letter of Authorization" from the client empowering the branch to handle the return, and had the client stamp it to ensure legal operational authority.

Tier 2: Cargo Information and Regulatory Matching

The logistics operations team reviewed the cargo against the requirements of Hong Kong's Agriculture, Fisheries and Conservation Department (AFCD), focusing on:

  • Whether the endangered species ingredients in each SKU were on Hong Kong's list of permitted import species.

  • Whether the packaging labels met Hong Kong standards (e.g., displaying the English warning "Endangered Species Cargo" and the AFCD filing number on the outer box).

Tier 3: Process Feasibility and Contingency Planning

The task force held an online review meeting to simulate the entire Hong Kong clearance process. They anticipated potential risks (e.g., on-site AFCD inspection of ingredients, requests for additional proof of the reason for return) and prepared response plans. This included contacting a local third-party testing agency that could issue a species ingredient verification report within 24 hours and collecting official documents from Shanghai customs as supplementary evidence.

After a two-day closed-loop audit, the Hong Kong branch confirmed that all documents were complete, compliance risks were eliminated, and the shipment could proceed.


C. Return to Hong Kong: From "Cross-Border Transfer" to "Clearance Breakthrough"

Restructuring Shanghai's Return Procedures and Gaining Approval:

The project team and the customs broker redesigned the procedures for the destination change to Hong Kong:

  1. Destination Change Application: They submitted a "Return Destination Change Application" to Shanghai customs, detailing the reason for the change and attaching the Hong Kong branch's audit report and the client's authorization letter. After one day of communication, customs approved the change.

  2. New Documentation: They created a new set of return declaration documents (including a new air waybill, invoice, and packing list) to ensure consistency with Hong Kong's clearance requirements.

  3. Supervised Transfer: They coordinated with the Shanghai customs-supervised warehouse to have personnel verify the cargo's quantity and labeling on-site, then completed the transfer procedures to move the goods to the cargo area of Shanghai Pudong International Airport.


Full Control and Risk Mitigation During Air Transport:

Given the cargo's contents, the transport had to comply with IATA's special cargo rules:

  • Airline Selection: An airline certified for transporting endangered species cargo (like China Cargo Airlines) was chosen. The "Certificate of Transport Conditions" and a copy of the CITES permit were submitted in advance to secure the booking.

  • Customized Packaging: Pressure-resistant wooden pallets were used, with "Fragile," "Moisture-Proof," and "Endangered Species" warning labels. Internal cushioning foam and desiccants were added to prevent damage.

  • Real-Time Tracking: The airline's cargo system was used to monitor the shipment's status at every stage—from takeoff in Shanghai to arrival and unloading in Hong Kong—with updates synchronized to the Hong Kong branch.


Efficient and Compliant Clearance in Hong Kong:

Upon the cargo's arrival at Hong Kong International Airport, the Hong Kong branch and its local customs broker activated a "3-Hour Clearance Response Mechanism":

  1. Pre-Submission: Clearance documents were submitted to the AFCD in advance. The AFCD completed its online pre-audit and approval in just one hour.

  2. On-Site Inspection: AFCD officers conducted a random inspection, verifying the species ingredients and labels. Thanks to the thorough preparation, the inspection was passed without issue, and a "Clearance Release Notice" was issued on the spot.

  3. Seamless Handover: After release, a customs-supervised vehicle immediately transported the goods to the branch's designated temporary storage facility to avoid extra demurrage fees at the airport.


D. Delivery to Client's Designated Location: From "Final Tally" to "Closed-Loop Sign-off"

Pre-Delivery Quality and Packaging Check:

At the temporary warehouse, the Hong Kong logistics team inspected the outer boxes for any signs of compression or damage and checked that the inner boxes were securely sealed, ensuring the packaging was intact for delivery.

Precise Delivery and Final Sign-off:

As per the client's request, the branch arranged for a local logistics company with "last-mile delivery" qualifications to transport the goods to a designated warehouse in Sha Tau Kok, Hong Kong:

  • Warehouse Coordination: They confirmed the delivery time (within the client's receiving window), unloading location, and sign-off procedure (requiring both the warehouse supervisor and quality inspector to sign).

  • On-Site Delivery: Upon the truck's arrival, they assisted the client's staff with a final count and inspection of the packaging and quality. After confirmation, the client signed a "Goods Delivery Acceptance Form," confirming "quantity complete, packaging intact, and no quality issues."

  • Document Handover: All clearance documents (AFCD notice, waybill copy, acceptance form) were compiled and handed over to the client as a basis for future handling of the goods (such as re-export or local sale).

The entire return process, from the setback in Shanghai to the final delivery in Hong Kong, was completed in 7 working days, achieving the goals of "zero delays, zero extra costs, and zero compliance risks." This marked the successful conclusion of the return logistics operation.


VI. Lessons Learned

This project successfully navigated a complex return shipment by leveraging multi-regional resource integration, professional expertise in compliant transport, and a rapid emergency response. The cross-regional synergy between our branches was the key to quickly developing a compliant solution. This approach enabled us to complete the entire process—from overseas pickup to cross-border transport and final delivery—while shortening the return cycle, reducing the client's warehousing and quality-related losses, and strengthening our partnership. The project serves as a replicable model for similar cross-border return shipments.


Contact Realogistics today for a quick quote!

WhatsApp: +85269373282

Realogistics International Group Co., Ltd. Established in 2012 in Hong Kong.

 
 
 

Comments


WIN Logistics golden Partnership

©2022 Realogistics International Group Co., Ltd. Copyright. Tsuen Wan ​| Hong Kong 

bottom of page